Tight Tailswing, Turnkey Solution

In the Southeast, Deep South performed a complex turnkey project that required equipment modification and careful planning.

To begin, Deep South received a reactor from the ship of origin and transported it via barge to a petrochemical facility up river. Using Goldhofer SPMTs, Deep South off-loaded the vessel from the barge and negotiated very tight turns and low pipe racks with minimum clearance to get it to the final off-loading location. Five-hundred-ton gantries were used to off-load to temporary supports.

Deep South modified the 1,500-ton VersaCrane TC-24000 specifically for this project to accommodate a very tight tail swing requirement. The vessel weighed 420,000 pounds, measured 100’ long and was lifted using 200’ of boom at a 95’ radius. Scheuerle SPMTs were used with the tailing frame to tail the load due to space constraints.

Deep South Crane & Rigging for turnkey projects
Deep South Crane & Rigging for turnkey projects

Related Projects

Heavy lift tail crane

Tailing Over a Live Pipe Rack Emphasizes Complex Project

View Project
Tailing Over a Live Pipe Rack Emphasizes Complex Project

From a tricky bridge crossing to a complex coordinated lift, Deep South facilitated the delivery and setting of components for a petrochemical facility acid modification and upgrade project in Louisiana. The key components included a 627,000-pound acid settler, 689,000-pound first stage reactor, acid storage drums and associated parts.

heavy lift crane services

15-Month Turnkey Transport and Erection Project at a Western Iowa Plant

View Project
15-Month Turnkey Transport and Erection Project at a Western Iowa Plant

Deep South was contracted to provide turnkey transportation and field erection services as part of a grassroots fertilizer project at a plant in Western Iowa. Over this 15-month period more than 150 pieces of plant equipment were successfully transported and erected.

caustic tower lift

Caustic & PreFrac Tower Lift

View Project
Caustic & PreFrac Tower Lift

Deep South Crane and Rigging was recently contracted by a southeast petrochemical plant as part of a major pre-turnaround project.  In order to de-bottleneck ethylene production, Deep South erected a caustic tower and a prefrac tower.

A successful job is built on precise planning and safe execution. request a quote